Skip to main content
Open
Main navigation
Home
Projects
Themes
African American History
American Experience
Art & Design
Civil War Era
Freedmen's Bureau
Mysteries of the Universe
Women's History
Museums and Archives
Archives of American Art
Freedmen's Bureau
Harvard-Smithsonian Center for Astrophysics
Search
About
Tips
Blog
Smithsonian Digital Volunteers: Transcription Center
Sign up
Log in
Transcribe page 7 of 11
This transcription is completed and pending approval.
Switch to vertical layout
Switch to horizontal layout
Go to previous page
Return to project home
Go to next page
Page #
Go
Download PDF for NASM-NASM.2014.0025-bx013-fd001_007 (project ID 24593)
Post NASM-NASM.2014.0025-bx013-fd001_007 (project ID 24593) to Facebook
Tweet NASM-NASM.2014.0025-bx013-fd001_007 (project ID 24593)
Instructions
Transcription
CCBD G1521R1 has been approved by the GFE CCB and the Arriflex handgrip will be modified to include a second microswitch to allow operation of camera from handgrip without camera switch in standby position. TREADMILL NOISE Additional crew usage, crew testing, and crew comments will be obtained after the next missions. FOOD TRAY - TO - LOCKER VELCRO MP/J. Blumentritt assigned action to correct the situation where two lockers are required for one food tray. More velcro will be applied to the lockers. The capability to mount one tray and tie up only one locker is required. VELCRO This subject will be worked off line as a CB input to the velcro maps. IFM (INFLIGHT MAINTENANCE) TASK IMPROVEMENTS MF/ J. Goodman assigned action to make analyses, and to implement warranted changes relative to Orbiter screws and fastners. A separate IFM meeting (with Messrs. Walker, Janes, Robbins, Townsend, and McAllister in attendance) will be held to review all IFM tools. One-of-a-kind items which are considered to be breakable may have quantity increased. SLEEP The 51-A crewmembers provided considerable data on sleep, sleep equipment, comfort, etc. Additional data will also be obtained from the next crews. FOOT LOOPS Action assigned to SP4/F. McAllister to propose straps which can be adjusted. LOCKER DOOR MEASUREMENTS Action assigned to SP4/F. McAllister to more clearly define the methodology involved. PORTABLE FOOT RESTRAINT Action is underway. A design change will be presented to the CCB December 10, 1984. This will review causes of, and prevention of, the universal being thermally locked into Y socket. AIRLOCK FOOT RESTRAINTS MF/ J. Goodman assigned action to analyze use of the restraints for subsequent EVA's. They were removed for EVA prep and to improve maneuverability. DEPRESS VALVE COVER REMOVAL
Notes on Transcribing this page (optional)
This section can be used to communicate any questions or concerns to Smithsonian staff, as well as other volunteers, about this transcription. Do not use to transcribe extraneous notes made by collector or other institutions.
Math question
8 + 2 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.
Inactivity Warning
We will release your lock in
5:00
.
Click here if you are still working on this page.