11:44 AM | [[arrow]] COMPLETE TAKING CORE AT 3660' COMMING OUT OF HOLE - NOTE - DRILLERS RECORD SHOWS 10' CORE FROM 3650'-3660'

2:20 PM | out of hole with core barrel
- Cole Q | 3655-3665, recovering 3'3" (=33%) of hard but friable, white, coral and shell limestone (one [[underline]]Pecton[[/underline]] in several pieces, wrapped in paper)
Core #9 3566-3665 (see above) | 

FITZPATRICK |
6:30 | FINAL PIPe ON REAMING DOWN TO 3665'
6 37 | DOWN TO 3665 - TROUBLE WITH CLUTCH ON WINCH - MAKING CONN;
6:49 | BEGIN DRILLING AT 3665
6:55 | AT 3695 VERY SOFT
7 22 | AT 3755 SAME AS PREVIOUS DRILLING - VERY FAST, SOFT & SMOOTH 
     |NO RESISTANCE TO BIT - VERY LITTLE PRESSURE BROUGHT TO BEAR ON BIT
8.58 | 3960'
     | TO 3963' PUMPING FOR 2 HOURS 2 CLEAN HOLE BEFORE PREPARING TO CORE - WILL START OUT OF HOLE AT 11:00 PM TO ADD CORE

June 3 | Tues Mid - 8 AM
| TOTCO run shows hole off 4° at 3963

[[/two column]]
[[circled]]5[[/circled]]


Please note that the language and terminology used in this collection reflects the context and culture of the time of its creation, and may include culturally sensitive information. As an historical document, its contents may be at odds with contemporary views and terminology. The information within this collection does not reflect the views of the Smithsonian Institution, but is available in its original form to facilitate research. For questions or comments regarding sensitive content, access, and use related to this collection, please contact transcribe@si.edu.