Viewing page 5 of 124

This transcription has been completed. Contact us with corrections.

[[3-column table]]
| CHAPTER |   | PAGE |
|---|---|---|
| 7 | BUILDING AND SITE NUMBERING SYSTEM | 13 |

| 8 | ASSEMBLY |   |
|   | Sequence | 14 |
|   | Binding | 14 |

| 9 | RECOMMENDATION AND APPROVAL |   |
|   | Clearance and Recommendation | 15 |
|   | Signatures | 15 |
|   | Comments and Exceptions | 15 |
|   | Approval by the Director | 16 |

| 10 | DISTRIBUTION AND FILING |   |
|   | Copy Distribution | 17 |
|   | Filing | 17 |
|   | Road Plan Reductions | 17 |

PART TWO
CONTENTS OF THE MASTER PLAN

| 11 | BASIC AND GENERAL DATA |   |
|   | The Cover Sheet | 21 |
|   | The Index Sheet | 23 |
|   | The Topographic Map | 27 |
|   | Development Outline--General Information | 28 |
|   | General Development Plan | 32 |
|   | Land Status Map | 32 |
|   | Utility Systems |   |
|   |    Development Outline |   |
|   |       Telephone Chart | 34 |
|   |       Radio Chart | 34 |
|   |       Power Chart | 34 |
|   |       Water Systems Chart | 34 |
|   |       Water Rights | 34 |
|   |    Drawings |   |
|   |       Communications and Power System Map | 35 |
|   |       Water Rights and Water System Map | 35 |

Transcription Notes:
Unsure how to transcribe header in the middle of table, unsure how to transcribe indented cells in the table. Correct if necessary.