•move COAS cal + IMU align from PDP to 6-7hr timeframe [Note: 1) IMU align would get picked up if day 1 re-entry required 2) verify capability to re-enter on COAS if ST fail (bias 5.25 degree quoted by GNC) 3) process R/W to have capability to change COAs bias I-load)]

•TACAN man tests: (RF interference)
IECM not O.K. (plume/contam.)
RMS - O.K.
TV - O.K.
PDP - O.K.
[[three lines above bracketed to the right "}Ruebens...v/m numbers available"]]
wireless - possibly intermittent noise on headset

KS
•Theoldite ops on STS-3
launch day - auto door ops, all sitting in PDP
orbit - manned door ops, use all tgts
entry - manual door ops - no long econ tgts (all others)
go for minimum data set each time (not standardized set of procedures)

•VRCS themed soak back tests - (flying of L5L).
Discussion:
1) L5L vs. L5D - L5D has real-time D/L data, L5L has same data, but DFI....keep L5L, since if jet is lost can still use VRCS (w/ mem R/W).
2) pulse no continuous: new gnd data, (& STS-2 data ?) show bad soackback (peak @ ~30 min) for some pulse case in thermal people may want to change from 125 sec cont.