This transcription has been completed. Contact us with corrections.
•move COAS cal + IMU align from PDP to 6-7hr timeframe [Note: 1) IMU align would get picked up if day 1 re-entry required 2) verify capability to re-enter on COAS if ST fail (bias 5.25 degree quoted by GNC) 3) process R/W to have capability to change COAs bias I-load)] •TACAN man tests: (RF interference) IECM not O.K. (plume/contam.) RMS - O.K. TV - O.K. PDP - O.K. [[three lines above bracketed to the right "}Ruebens...v/m numbers available"]] wireless - possibly intermittent noise on headset KS •Theoldite ops on STS-3 launch day - auto door ops, all sitting in PDP orbit - manned door ops, use all tgts entry - manual door ops - no long econ tgts (all others) go for minimum data set each time (not standardized set of procedures) •VRCS themed soak back tests - (flying of L5L). Discussion: 1) L5L vs. L5D - L5D has real-time D/L data, L5L has same data, but DFI....keep L5L, since if jet is lost can still use VRCS (w/ mem R/W). 2) pulse no continuous: new gnd data, (& STS-2 data ?) show bad soackback (peak @ ~30 min) for some pulse case in thermal people may want to change from 125 sec cont.