![Transcription Center logo](/themes/custom/tc_theme/assets/image/logo.png)
This transcription has been completed. Contact us with corrections.
[[underlined check]] cc tag up [[underlined check]] problems meeting [[large curly bracket for above]] Friday? STS - mass memory verify until CSOO [[?]] back out part of patch (CR) + re-try SP+ single/coarse [[underlined check]] Call Bill Nesbitt (ST 223) PECK: procedurally, make sure switches controlling MEC's are off they pull over LDB1, + would put garbage on the bus + cause dropouts. [Is there anything else on the bus?] RMS JETT Panel (A14) - nomenclature changes are trivial if the panel is already out, but grossly expensive if the panel needs to be pulled. Dale suggests 1[[circled]] sticky tape changes to -102 (the "mandatory" changes only) 2[[circled]] keep an eye on that panel - if it comes out, go for permanent changes 3[[circled]] submit ECN to change panel for OV-99 4[[circled]] check in SMS: how is panel [[underlined]]cover [[/underlined]] built