This transcription has been completed. Contact us with corrections.
type req. "DV" (a Tech buy-off). -Check % of techs who are DV's.... do they buy [[?]] off their own work? 8. Has OMRSD been beaten [[?]] against CIL (or equivalent) to identify to techs & engineers that they're working on a crit 1 system? 9. Vehicle repairs & mods - John Chase has documentation on backlogged mods for 102, 103 & 104 - Lamberth will give us info on -099. Repairs & mods are determined by what fits into schedule based on availability of (1) engineers & (2) spare parts & (3) time 10. Turnaround testing - no willingness to admit that we're cutting back past "recommended" limit 11. Standard inspections - get Pan Am study (we've asked for it). Finished in Dec 85... is NASA paying enough attention to airline - type inspections? -get Challenger waiver info (got it for other 3); get explanation (apparently RI didn't sign up for 4 of waivers on 51L) [check w/ RI] 12. Spare parts are a problem (Ed McKinzie preparing position paper) NASM 9A12458 Cover is 9A12459
Transcription Notes:
Unsure on some words for point number 8.
This page is a copy of previous pages. Per previous pages, changes made to point 8 to reflect other entry.