Viewing page 22 of 52

This transcription has been completed. Contact us with corrections.

9/3/81
SMS Pre-T and O
  Final MM load tape 3/17   w/MEC and final TACAN 1/L's

 Post STS-1 tray plans :
      Add ~15 results to 120 load
      Use ~1mo, til 201 available

      Currently sched^d off SMS 4/17-5/15

      201=18.11/11.2  Due 6/15

      Try to get stand-alone try on 18.11 level load
              prior to 201 date

      SIMFAC possible - fam;malfs;data for SMS compare


10/3/81

    Willy Shelton (CF?) tracking IMU BITE's for STS-1
              x5395


    R16 SRR 1/602 1300 today


    Gremillion - IMU OPER * CR