This transcription has been completed. Contact us with corrections.
9/3/81 SMS Pre-T and O Final MM load tape 3/17 w/MEC and final TACAN 1/L's Post STS-1 tray plans : Add ~15 results to 120 load Use ~1mo, til 201 available Currently sched^d off SMS 4/17-5/15 201=18.11/11.2 Due 6/15 Try to get stand-alone try on 18.11 level load prior to 201 date SIMFAC possible - fam;malfs;data for SMS compare 10/3/81 Willy Shelton (CF?) tracking IMU BITE's for STS-1 x5395 R16 SRR 1/602 1300 today Gremillion - IMU OPER * CR