This transcription has been completed. Contact us with corrections.
Project No.__ TITLE 1/11/82 Book No.__ 41 From Page No._ Vehicle Status Powered up 0200 V1061 preps in work OSS-1 installed; DFRC access GSE fit checks in work 2 hyd leaks over weekend - swayed T & RSB PDU (sys3 vice Sys 2 line) MMU #1 retest cmplt IECM lifting and functionals done PRSD line work complete (braising etc) done for cryo tank install n APU oil flush to be done vertical so no MMIT sitting on seal. A6 PDRS TV panel to be pulled & spare put in (B145 call) - to fix STS-2 problem with 1 camera apparently running too fast & running out of film. PBD seal repair cmplt; final closeout today. IPR's 164 - Fwd PCA RPC T/S found proced/confy error (no pwr on RJDF bus A) Successfully retested this am. 151 - No MSBLS range lock. Believe they found a GSE problem. 168 - GPC 1 self fail. Procedural. 169 - SSME 1 GO2 check valve leak; seal replaced 126 - check valve - retested OK 167 - MPS solenoid valve leaking 170 - DEV 2 failed to go to RUN - [[crossed-out]] l [[/crossed-out]] insufficient time given to DEV 1 load GAS going in today. I/F test probably tomorrow morning. REM markings? - Should have whiskers on guides & tips of pins painted black. Make sure we've got em by S0031 time. - Lee Harrison - called her to check it out To Page No.___ Witnessed & Understood by me,_____ Date_____ Invented by_____ Recorded by_____ Date_____
Transcription Notes:
----------
Reopened for Editing 2023-03-30 09:45:08
----------
Reopened for Editing 2023-03-30 11:08:07