Project No.__ TITLE 1/13/82 Book No.__ 43 From Page No._ Vehicle status [Holding PBD debond repair for adhesive test results; bent tab fixed jammed monkey fur V1061 I/W. Still -8hrs. 3GSE IPR's 1055 POT H2O cmplt 1022 NH3 started this am. Local clear 1st shift HYD LK CKS - 3 leaks found (1 on PDU; 2 on T fitting; 1 drop/4min or so) Lower T fitting point still 1 drp/25min; loosen & re-torque. Say they'll fly w/ 1/25min if that doesn't work V1011 I/W Oxid side done; Fu side today IPR's V1102 Low [[Ohms symbol]] on P/L TR input. May be instrument problem; Stilges' guys say they screwed up DEV pwr supply BITE CRT1. Dumped & sent to IBM. No on-board indications ET/SRB Start skirt cut today. ET & crossover covers & fit cks I/W. LT weight the plans - MSFC must commit to new lt the sensor location by May. For 50037 want to swap pins on LH2 sensors & fill to higher set of sensors. Can watch nominal STS-3 tanking stuff as well & will tank to normal level for launch. SSME LOX feed sys showed pressure high downstream of GOX HX indicates either leaky anti-flood valve or GOX control cheek valve that pressurizes POGO accumulator. IPR LRCS FU He tank was venting & went below 40[[degrees]] reqmt (to 29.4[[degrees]]) MEC diode module - May see retest (bench) reqmt in. 1300 STS-3 assessmt review 1400 Orbiter CCB lead issue = 099 C/O activities @ KSC us PMD Open issues: DIT runs @ KSC: which ones? OPF &/or VXB? HMF activities for OMS/RCS Duplication of any E-T-E's Abrahamson wants turnaround enhancemt items worked in next budget cycle Honeycutt's due date is late next month To Page No.___ Witnessed & Understood by me,_____ Date_____ Invented by_____ Recorded by_____ Date_____
Transcription Notes:
----------
Reopened for Editing 2023-03-30 16:13:49
----------
Reopened for Editing 2023-03-30 11:21:22
Found references on NASA.gov:
LOX = Liquid Oxygen
SSME = Space Shuttle Main Engines
----------
Reopened for Editing 2023-03-30 14:29:48