Viewing page 295 of 386

This transcription has been completed. Contact us with corrections.

[[preprinted]] 231 [[/preprinted]]
1889
[[image – purple stamped letter "C"]] 
May. 2[[underline]]nd[[/underline]] Boston Office
send in 1 No 27 Clock packed ready
for shipment.
May 2 Em
[[diagonal line drawn through this section from bottom left to top right]]
[[line across page]]
May2 Chicago Office
1 #69 Clock 4 1/2 in. 40.-
May. 6. Pl
[[diagonal line drawn through this section from bottom left to top right]]
[[line across page]]
May2 R.J. Cushing
Boothbay Harbor, Me.
3-Pins for [[snig?]] pulleys 1 pin for dou pulley
1 in dia.
May 2 Eb
[[diagonal line drawn through this section from bottom left to top right]]
[[line across page]]
May 2[[underline]]nd[[/underline]] The Elec. Gas Lightning Co.
35 Arch st. Boston
1- Clock Train - to order net 13.63
#2911
cMay. 7 Pl.
[[diagonal line drawn through this section from bottom left to top right]]
[[line across page]]
May 2 A.E. Rowe
4 Dock sq. Boston
1 No 0 striking Train mounted on striking frames. (parts not wanted Unlocking Lever, Outside Lever Rock slide &pillars, Fan Dog, Gathering pallet, striking Lever &its mountings) $115.-
less 20 & 10%= 82.80
Cr. for parts not wanted $10.- 20 & 10% = [[underline]] 7.20 [[/underline]] 75.60 net.
May. 22
[[diagonal line drawn through this section from bottom left to top right]]