Viewing page 26 of 107

This transcription has been completed. Contact us with corrections.

Log

PagePlateClassObjectR.A.DecStartObs H.A.Obs DecStopExpDateMiscellaneous
5216291P05 240 04 W+90.006 00Jan 06 1906Signals stopped: as first armature held down at instrument. Adjusted relay without much success until front was removed & filed. Raised east alt. screw. Tightened east az screw. x 16291 Pole test plate. As too 5 55 clock stopped to make trail.
5216292Ecl Jup Sat I07 43 45-74 03 W+19.008 08 15Jan 06 1906Moved N end of axis west & lowered sound end. x 16292 This plate was exposed for practice, but as wrong watch was used no intelligent record can be made.