Viewing page 84 of 409

This transcription has been completed. Contact us with corrections.

Friday
Clear- Snow Storm
MARCH 6
26

Up at 0230M. During the first half of the morning we did mock ups.  Mounting the K-3B Aerial Camera on a launch and rack which was the same as the rack in all U.S. planes.  After breakfast Nulty McCullough and I disassembled and reassembled the Case drive ass'y.  I got the cycle of operation and part names down fairly good.  Eight of the finest men in the class went up today and then it stormed so they had to land at Paeblo Colo. They will be back tomorrow.  I wish I could have gone along.  Talked to Fritz Lauzel during the afternoon.  Didn't eat any supper so I wrote a letter and went to bed about 02030M.