of present building and used in new building  two pairs of sash doors to be put in place of same present second story windows to be used in loft and doors put in place of same building to be covered with best quality roofing tin with leaders at each end enclose building [[strikethrough]] with [[/strikethrough]] on sides with hemlock battond over joints  the rear to be enclosed with tongue and groove 9 1/2 inch boards with 2 inch battons  two flues 16 inches square and stairs to be built where directed by said party of first part  stairs to be enclosed with ceiling boards  the within work to be completed for the sum of one thousand and seventeen dollar in installments as follows

$300.00 when frame is raised
$300.00 when enclosed and floor laid
$417.00 Ballanse as per agreement when completed

The same party of the first part agrees for and in consideration of the faithfull