8/28
ST3-1 SMS 
In FOD ST3-1 facility requirements meeting, 
LE led us through a justification of each
piece of new hardware + each upgraded 
facility to determine whether we really 
needed it in order to train + develop procedures for
inspection/repair with either the  RMS/boom 
or the MMU. The RMS - related questions were 
1. what facilities to we use to 
train
2. what facilities do we use to 
develop procedures + techniques
3. what capabilities are required by these facilities
UNDER CONSIDERATION: SMS
SES
SIMFAC
MDF
(HP9835 exists, + will be used-
no changes or action required)
my job: present the case for the SMS 
(we were considering saying it wasn't required). 
I gave the following pitch: