This transcription has been completed. Contact us with corrections.
8/28 ST3-1 SMS In FOD ST3-1 facility requirements meeting, LE led us through a justification of each piece of new hardware + each upgraded facility to determine whether we really needed it in order to train + develop procedures for inspection/repair with either the RMS/boom or the MMU. The RMS - related questions were 1. what facilities to we use to train 2. what facilities do we use to develop procedures + techniques 3. what capabilities are required by these facilities UNDER CONSIDERATION: SMS SES SIMFAC MDF (HP9835 exists, + will be used- no changes or action required) my job: present the case for the SMS (we were considering saying it wasn't required). I gave the following pitch: