8/31    ST3-1  RMS
        (Bootick, Ernull)

Presented results of "Abbey brief" (what should we do with SMS?) to Bootick & Ernull with the aim of
1.  Getting O.K. to go ahead (support) from Booktick
2.  a plant to mobilize the troops from Ernull
---we succeeded.  Booktick stamped the idea (agrees we need SMS); Ernull agrees we can begin a "minimum risk" approach: start with changes which aren't ST3-1 specific -- which are required eventually anyway. Then if the inspection/repair dies, we haven't lost anything.
PHILOSOPHY:
"do it wrong, then fix it"
to
"do it right, then add ST3-1 piece"
hopefully we can start with the "do it right," and only move on to "ST3-1 piece" if required