This transcription has been completed. Contact us with corrections.
8/31 ST3-1 RMS (Bootick, Ernull) Presented results of "Abbey brief" (what should we do with SMS?) to Bootick & Ernull with the aim of 1. Getting O.K. to go ahead (support) from Booktick 2. a plant to mobilize the troops from Ernull ---we succeeded. Booktick stamped the idea (agrees we need SMS); Ernull agrees we can begin a "minimum risk" approach: start with changes which aren't ST3-1 specific -- which are required eventually anyway. Then if the inspection/repair dies, we haven't lost anything. PHILOSOPHY: "do it wrong, then fix it" to "do it right, then add ST3-1 piece" hopefully we can start with the "do it right," and only move on to "ST3-1 piece" if required