Viewing page 9 of 186

This transcription has been completed. Contact us with corrections.

updates:

05 checkout 9/17
pre-sim review 9/21
sim starts 10/1

THC TRR (Test Readiness Review) in Montreal on 9/24

ASAD parameter study is complete and published (Milt will supply us with a copy)

things to do
1. Organized FOD (CG, CF) for the integrated verification. We're responsible for signing off
PROX OPS (Model)
COLLISION AVOIDANCE (Ramon)
"EVERYTHING" (RAMON)
this means from results of SAIL/MDF ONLY

2. review 
R849
OSOP

3. identify "2 crewmember" DTO's

4. for Ron: 
- GPC Data Warning light (resets how?)
- Master Alarm circuity (resets how?)
- IECM tests on ABF with flight RMS (get these moving)