updates: 05 checkout 9/17 pre-sim review 9/21 sim starts 10/1 THC TRR (Test Readiness Review) in Montreal on 9/24 ASAD parameter study is complete and published (Milt will supply us with a copy) things to do 1. Organized FOD (CG, CF) for the integrated verification. We're responsible for signing off PROX OPS (Model) COLLISION AVOIDANCE (Ramon) "EVERYTHING" (RAMON) this means from results of SAIL/MDF ONLY 2. review R849 OSOP 3. identify "2 crewmember" DTO's 4. for Ron: - GPC Data Warning light (resets how?) - Master Alarm circuity (resets how?) - IECM tests on ABF with flight RMS (get these moving)