Viewing page 10 of 186

This transcription has been completed. Contact us with corrections.

9/6 PL RET SYSTEM

There's an interface problem between the latch microswitches that now exist in the payload bay, and the latch status matrix on CRT SPEC 096. JSC submitted a RID at the CDR in Downey 8/79 to make the display/wiring consistent; RI signed off & agreed (presumably involved a patch panel - additional hardware)... now they're backing off.