Viewing page 63 of 186

This transcription has been completed. Contact us with corrections.

11/6 

PL STATUS DISP

meeting with Chuck Stough, Bob Plummer, Bill Boone (STS-3), Anngie Johnson (IECM) & Ron McNair.
Chuck wanted to remove the PL latch status from the PDRS Control Spec, with the aim of eliminating an item entry (item 22) on the spec, therefore saving ~150 words in core. 

We had already created SPEC 097, the PL STATUS disp, to handle IECM latch status. 

The meeting was to decide whether to move PFTA latch status to that disp as well (+ scrub it off the PDRS control). 

Decision:
- create spec 097
- have IECM & PFTA latch status on 097
- take PFTA status, & item 22 off 096
- adopt the configuration shown on following page: