FLIGHT TEST PANEL

1. DTO 241 - MPS INERTING

• C&W "expected" (hindsight) - will recur

• scheduled twice on STS-3 (already baselined)
(probably only 1 required - keep 2nd in as a "contingency")

2. DTO 244 - HYD FLUID CONDITIONIN

• accomplished on STS-2 (though DFI not on)

• analysis (projection to cold case) still required to determine whether this technique (cycling actuators) works [& whether I-loads need to be changed]

• doing this "for real" on STS-3 (but shouldn't need this, since were not de-orbiting out of cold attitude)

- need "de-orbit from cold case" page in CAP/PDP?

3. DTO 247 - PRCS LEAK DETECTION TEST 

• STS-2 date sufficient; no req for STS-3

• jets didn't deselect

4. PRSD stratification

• not performed - still need data... rescheduled for STS-4 
(note: DFI not needed for test)

5. PLBD DTO 251 (theodolite)

• 3 data pts on STS-2.... basically not performed (2 ref, 1 C/L on STBD door)

• already baselined on STS-3 (no changes recommended)