This transcription has been completed. Contact us with corrections.
7 DEC STS-3 mtg •RMS SY •FLT TEST PNL - VRCS db gg s-band test theodolite schedule: (Thurs SMS - day 2 CAP) Contamination Survey mtg CAP verification (watch runs, book-keeping, xfer comments) Mission rules mtgs PDRS STS-2 C/L comments (Gordo) •Data required: what goes on VTR, what goes on DAC? Coordinate with CG/NRC •Audio on VTR - useful? required? If so, come up with procedure (Fendell) •color coding in C/L: DAC - red VTR - yellow [[the two lines above are bracketed on the right with "}good"]] •joint angles and xyz/pyr not both required (only for reference, in back of C/L) •contact MPAD for pictures (req. only end-points) •fly tile inspection pages in contingency data