Viewing page 10 of 71

This transcription has been completed. Contact us with corrections.

7 DEC
STS-3 mtg
•RMS SY
•FLT TEST PNL - VRCS db
gg
s-band test
theodolite
schedule:
(Thurs SMS - day 2 CAP)
Contamination Survey mtg
CAP verification (watch runs, book-keeping, xfer comments)
Mission rules mtgs

PDRS STS-2 C/L comments (Gordo)
•Data required: what goes on VTR, what goes 
on DAC? Coordinate with CG/NRC
•Audio on VTR - useful? required? If so, come
up with procedure (Fendell)
•color coding in C/L: DAC - red
VTR - yellow
[[the two lines above are bracketed on the right with "}good"]]
•joint angles and xyz/pyr not both required
(only for reference, in back of C/L)
•contact MPAD for pictures (req. only end-points)
•fly tile inspection pages in contingency data