Viewing page 30 of 71

This transcription has been completed. Contact us with corrections.

26 JAN. CEIT NOTES

1.SLEEP STATION: EXTRA LOCKER? (MF 280)
MLR TEMP?

2. PGU (LOCATED BEHIND H2O TKS)
GET PICTURE FOR CAPCOM

3. MLR: HOW HOT, WHERE? (112°F MAX)

4. AC PWR PROBLEM: AU OUTLETS USED (FOOD WARMER: ABOVE WCS)

5. T/P & EEVT CONNECTED PRE-LAUNCH
(EEVT: PROCEDURE ≥ 15 MIN SET-UP; ADD ✓ LENS CAP)

6. Suits stowed next to TIP (EEVT ABOVE TIP

7. ADD VELCRO: FLT DECK; L 10, 11; IFM TOOLS

8. VCAP: CMRA/BRACKET LOOSE IN 1 ORIENTATION (O.K. 180-OUT)

9. GAS: HAND CNTLRS BATTERY PWR'D, HOOK UP TO L11

10. THEODOLITE (LONG #1 DELETED; C/L #14 BLURRED)
L,F USE 1 MIN PER SIGHTING. NOTE [[arrow]] ON SILL

11. RMS IFM- SHLDR BR REL - EASY
PWR-6TH OF 6 CONNECTORS-TOUGH (NO VIS TO PINS)

12. CCTV MONITOR IFM-EASY