This transcription has been completed. Contact us with corrections.
5-15 Orb Ops C/L: (first with Rowles, Truly, then just Rowles) review of 6/11/81 dated C/L (selected pages) Three Sys Interaction Test (243-02) [[left margin]] HR [[/left margin]] • put constant changes in a table similar to C/W parameter changes: [[left margin]] ORB OPS CL [/left margin]] [[4 column table]] | PARAM NAME | CONST ID (ITEM 16) | DESIRED VALUE (ITEM 17) | NOMINAL | | --- | --- | --- | --- | | ELEV LOB 1 | ______ | ______ |[[blank]]| | 2 | ______ | ______ |[[blank]]| | 3 | ______ | ______ |[[blank]]| [[/end table]] Mark will consider possibility of combining the "nominal" values into the same table [shortening INITIATE & TERMINATE sections] • no reason to check cb's & switches at the beginning of FTO's if they're in the nominal on-orbit configuration • add notes in CAP & monitor RSVR QTY • add change to C/W limits for RSVR QTY (for quicker leak detection [[left margin]] Hk [[/left margin]] • Standard: leading zeros shouldn't be in FDF FD GPC Memory Dump [[left margin]] Hk [[/left margin]] • under verify ops RCDR status (come up with a new table): sufficient tape available if: fwd 10%-65% rev 42%-95% • add LDB deassigned to NBAT
Transcription Notes:
I don't know how to add in the Hk initials on the left margins