Orb Ops C/L: (first with Rowles, Truly, then just Rowles)

review of 6/11/81 dated C/L (selected pages)

Three Sys Interaction Test (243-02)

[[left margin]] HR [[/left margin]]

• put constant changes in a table similar to C/W parameter changes: 

[[left margin]] ORB OPS CL [/left margin]]

[[4 column table]]

| PARAM NAME | CONST ID  (ITEM 16) | DESIRED VALUE (ITEM 17) | NOMINAL |
| --- | --- | --- | --- |
| ELEV LOB 1 | ______ | ______ |[[blank]]| 
|          2 | ______ | ______ |[[blank]]| 
|          3 | ______ | ______ |[[blank]]| 
[[/end table]]
Mark will consider possibility of combining the "nominal" values into the same table [shortening INITIATE & TERMINATE sections]

• no reason to check cb's & switches at the beginning of FTO's if they're in the nominal on-orbit configuration

• add notes in CAP & monitor RSVR QTY 

• add change to C/W limits for RSVR QTY (for quicker leak detection 

[[left margin]] Hk [[/left margin]]
• Standard: leading zeros shouldn't be in FDF

FD GPC Memory Dump 

[[left margin]] Hk [[/left margin]]
• under verify ops RCDR status (come up with a new table):
sufficient tape available if: fwd 10%-65%
                              rev 42%-95%

• add LDB deassigned to NBAT