Viewing page 79 of 170

This transcription has been completed. Contact us with corrections.

5-29
[[margin]]CAPCOM[[/margin]]
Orbit team mtg - MOE STS-1 FDF, pick up at 3:20 in PDP. on 6/2 (same thing on 6/4) Holloway taking 6/2 soon, Lewis taking 6/4. No full duration sims (2-3 days max) SM FDA parameters review [what parameters can be inhibited - and let ground monitor parameters. Teleprinter to be exercised. 
EGIL = TIMBU (SM/SW)
INCO = instrumentation/parameters

[[margin]]KSC[[/margin]]
KSC testing 
V1066 QMS/RCS: only the split par test. (OPF) Should additional tests be performed to check RJD drivers

CEIT: IVA, EVA, & IFM. Theodelite will be checked during OIT, check access & centerline latches over IECM; MCIU pin connector (put power & pins to 1) release shoulder brace 2) power through to RMS sel switch)

SIT: 3 runs (ascent; entry, BFS RTLS)
CDDT: with[[chase?]], starts "L-2 days"

RMS stuff & track:
-✓ malf procedures to T
- PDRS memory reads for ref data book
-✓ DAC formating