![Transcription Center logo](/themes/custom/tc_theme/assets/image/logo.png)
This transcription has been completed. Contact us with corrections.
questions: (1) oms burns : burn on 1 GNC & 1 SM computer (not 2 GNC) (2) SPC, RTC, DEV equivalents [[Left Margin]] SMS [[/Left Margin]] SMS/RMS : malf procedures verification assumptions presume that the 201 load will be essentially useless... but that malfs will be fixed by the 202/203 loads (mid-late July & late August); even then, only a small fraction of the malfs are implemented in the SMS (only a certain number of failure blocks can be reached). CG6 check-out of the model starts 2/9 & 2/11 (1600-2000). [[Left Margin]] CAPCOM [[/Left Margin]] CMD: needs SPEC 1 to get the variable D/L parameters (SM are primarily DPS; GNC are primarily GNC...they're parameters required for system monitoring - & priority ought to be established by people needing the data. Also...the earlier in a pass that SPEC 1 is called up, the more time CMD has to complete the job.