Viewing page 83 of 170

This transcription has been completed. Contact us with corrections.

questions:
(1) oms burns : burn on 1 GNC & 1 SM computer (not 2 GNC)
(2) SPC, RTC, DEV equivalents

[[Left Margin]]
SMS
[[/Left Margin]]
SMS/RMS : malf procedures verification assumptions
presume that the 201 load will be essentially useless...
but that malfs will be fixed by the 202/203
loads (mid-late July & late August); even then,
only a small fraction of the malfs are implemented
in the SMS (only a certain number of failure blocks
can be reached). CG6 check-out of the model starts 2/9 & 2/11 (1600-2000).

[[Left Margin]]
CAPCOM
[[/Left Margin]]
CMD: needs SPEC 1 to get the variable D/L parameters
(SM are primarily DPS; GNC are primarily GNC...they're parameters required for system monitoring - & priority ought to be established by people needing the data. Also...the earlier in a pass that SPEC 1 is called up, the more time CMD has to complete the job.