This transcription has been completed. Contact us with corrections.
(7) 1110 schedule: [PWRDN on SUNDAY] Latch tb & heater measurements re-wiring require breaking connection & ∴ retest of MPM/MRL. Mechanical mate probably early 2nd shift Friday (8) IPR on latch/rel/RDY indications (9) RHC mount (coming in ~7/3) (10) qual EE (11) RMC coord logs 6/29 • CEIT complete PL rcdr changeout not reasonable, DFI rcdr changeout is reasonable. (2nd half on 13th & 14th) Wireless comm to be used in OIT. Nominal config: HIU + star headset until theodelite deploying...then go to wireless • 4400# deficit for ascent. Solution: 1) seasonal update - 800#, 2) decrease loft by 50% - 700#, 3) 38° inclination - 1600#, 4) 130 x 130 orbit - 2300# => +[[plus]] 5400# gained (1000# over) • 41C deorbit program to be used in long sim • PLB lights - mod kit installed....total of 7 (6 in bay, 1 bulkhead) 1) 3 failed on STS-1, all from same box (KSC test showed failure), 2) new lights can't be used with OSTA (heats pallet) 5 ft candles @ [[at]] 15' per light (would show PL @ ~750')