sims 6/30: pick up at Day 2 4+45 long sim 7/7 8/1 8 hour sim, 5 additional 0/0 & 1 additional long sim 2 IMV aligns per day, 2 FC purges, exercise RMS OSTA [[sqrt]]6 REFS DTO's (OMS, RCS, ST, CIRC PUMP, S-BAND, EVA demo) •water dump constraints with OCE, SMIRR, SIR-A (5 min MIN) •SIR-A/RMS: Guillory will respond K8 ops not •acceptable, OSTA will ask for waiver •dump H[[subscript]]2[[/subscript]]O twice per day (scheduled) [waste tk isn't loaded] •SIR-A auto sequencer not going to be used (all manual ops — sequencer could be re-programmed, but would not be tied to MET)