8-24

NOAA: CO2 laser (pulsed) to get entry winds

Teleprinter msgs
(1) comm support schedules site (30 min - ~1hr before)

(2) 5 min before site, do check (& configure site)

(3) AOS + 15 sec: turn on modulator
    (30 sec initialization + in high pwr)
    (then send message)
    turn modulator box off immediately
    (then requires 90 sec for T/P to return to low pwr before A/G 2 is useable.)
    cue to reconfigure to A/G 2: 450 hz signal drops off line ( ∴ T/P is off, out of hi-pwr mode)
    MSK 1930: shows T/P msgs "in work"

8/25
OSTA activation/deactivation: originally suggested for emergency powerdowns .... required? Not required? Talk to Hauck.

Orbiter inspection: (Guillory mtg):

ATTITUDE: + ZLV, tail first
~10-15 min required for mnvr
Won't stow radiators
UHF - only sites? (XMTR will be off)
lighting: ±60˚ cone in sun is OK .... as is night & light