Viewing page 8 of 130

This transcription has been completed. Contact us with corrections.

OSTA-2 (info from PIP - jsc-14044.... useless)

1. MEA (MATERIAL EXP ASSEMBLY) -3 EXPERIMENTS, OPERATE IN A FIXED SEQUENCE. SOME THERMAL & ACCELERATION CONSTANTS (FREE DRIFT REQUIRED)

2. MAUS (MATERIAL WISSENSCHAFTLICHTE.....) - 3 EXPERIMENTS, CAN BE OPERATED IN PARALLEL. [[?]]

BOTH CONTROLLED THROUGH STANDARD SWITCH PANEL (NO GPC INTERFACE)

PWR: ORBITER 28V FROM SSP FOR MAUS act/de-act. OSTA PALLET BATTERY SUPPLIES PWR FOR EXPERIMENTS

COOLING: NONE REQ'D FROM ORBITER - EXPS CARRY He + H2o FOR COOLING & PURGING

KSC opo: PALLET IS LOADED AT PAD, USING PGHM