Viewing page 51 of 130

This transcription has been completed. Contact us with corrections.

• KSC: telesat end-to-end test is scheduled
• CCTV complement?

Call Karen: PDRS VERIFICATION 

JWB in Germany (wk after we are) 

Talk to Marty Mass about orbit map (FDF)

29 July - Conrad Moritz (MBB - project manager) 
• battery lifetime? (p 3 of handout) theoretical margin ~ 20%
actual: 70 Amp Hr batteries test to ~ 95 Amp Hrs
• mass spec - orbiter environment measurement 
• antennae - 2 hemis? yes [[drawing unable to be transcribed]] antenna pattern - ~1° gap only 
? • free drift for 1 hr - expected drift/tumble rate? 
• operation of experiments from off-nominal orbit? 
① how is MOMS affected (exp adjustment necessary preflight?)
② yaw sensor effect? 

• Can we see mass spec "swivel mount" motion? Yes
each sequence (program) controls swivel. Those during attached phase are continuously swivelling; during detached fixed swivel, pointing back toward orbiter

? • are PI's aware of TCE and IGCM results
• solar cell - 2 takes req'd? Or can we get all data in one solar pointing session? (which experiments might overheat?)- LUNNEY'S PROMISE RULES THIS