This transcription has been completed. Contact us with corrections.
RMS ISSUES TO FOLLOW: • EE: SPAR building for BAU through GSFC. "Smart" EE, which relies on sensed tension (rigidization) to make connection. (plunger from PL side of GF). McPherson is contact... is there a model on site? [[left margin]]✓Fa[[/left margin]] ✓- •Spare MCIU: PRCB approved for 11&13, not beyond. (?)Fabian looking into it(?) do we need one? [[right margin]]Reeve's checking status...agrees we don't need one.[[/right margin]] [[left margin]]✓Fa[[/left margin]] ✓- •what were actual STS-7 tip-off rates? ✓- •teleprinter...how long is it manifested? (BJ)(through STS-11 or until TAGS works) • for reference, get STS-7 • stowage list (ref data book) • personal equipment • REL 22 info ✓-• check into SMS & MDF for ERBS deploy tng (SMS-Steve Nagel)<-- STS-17 PL assessment due from Singer soon (MDF-JMF)<--all payload will have mock-up for MDDG tng ✓-• EVA removable GF: current design has it deadfaced on the PL side (i.e., wires are still hot through GF after deadface) -- what procedures are req'd to deadface the section to be cut during EVA? [[right margin]] htrs-off/cb-op [[//right margin]] -.Get drawing of GF (McPherson?)
Transcription Notes:
- I couldn't do bullet points correctly
- some words I couldn't read (as indicated above)
- didn't know how to denote check marks
- wasn't sure how/whether to indicate indent on secondary bullets