Viewing page 99 of 130

This transcription has been completed. Contact us with corrections.

RMS ISSUES TO FOLLOW:
• EE: SPAR building for BAU through GSFC. "Smart" EE, which relies on sensed tension (rigidization) to make connection. (plunger from PL side of GF). McPherson is contact... is there a model on site?

 [[left margin]]✓Fa[[/left margin]]
✓- •Spare MCIU: PRCB approved for 11&13, not beyond. (?)Fabian looking into it(?) do we need one?
[[right margin]]Reeve's checking status...agrees we don't need one.[[/right margin]]

[[left margin]]✓Fa[[/left margin]]
✓- •what were actual STS-7 tip-off rates?
✓- •teleprinter...how long is it manifested? (BJ)(through STS-11 or until TAGS works)
• for reference, get STS-7
    • stowage list (ref data book)
    • personal equipment
    • REL 22 info
✓-• check into SMS & MDF for ERBS deploy tng
    (SMS-Steve Nagel)<-- STS-17 PL assessment due from Singer soon
    (MDF-JMF)<--all payload will have mock-up for MDDG tng

✓-• EVA removable GF: current design has it deadfaced on the PL side (i.e., wires are still hot through GF after deadface) -- what procedures are req'd to deadface the section to be cut during EVA?
[[right margin]] htrs-off/cb-op
[[//right margin]]
-.Get drawing of GF (McPherson?)

Transcription Notes:
- I couldn't do bullet points correctly - some words I couldn't read (as indicated above) - didn't know how to denote check marks - wasn't sure how/whether to indicate indent on secondary bullets