This transcription has been completed. Contact us with corrections.
ERBS MTG (3 NOV) (NOTE: all GSTDN sites still active except IOS and BUC) • "command & dump" memory - "TDRS direct" ... what does that mean? • FDSA time estimate doesn't include PDI reconfig time • from Michele: get ✓• list of PDI format (on its way) ✓• latest PIP? yes, but 10 updates. (she'll send) ✓•UMB experiences (in discussion now) •possibly do rcdr dumps over STDN sites (phase 1H) POWG is scheduled for ~11/29 (try to meet before then) 8 NOV ✓- call Jeri Brown (PLAID for ORS ops) (possible ... ~ 2 wks -they have good enough drawings for a start) ✓-•CRIP: opposition and HDRR ...no ops during EVA? (dump tape and change tape) PINK - can you operate KU band while EVA? (Not in comm mode unless orb. is structured to pt ant. away from bay) note: mtg on 11/18 with Michelle and PL's on ERBS (working mtg) • ERBS PD1 questions...they want 7 formats ("low" data rate, so they aren't tiedand Ku) e.g. 12.8 kbit: have 3 diff formats ...eng, exp, SAGE...negotiations underway and cut down the requirements (tell Dave) • RTC only used with PLMDM, Flex MDM, or discrete I/O device. PDI doesn't work like that, so couldn't send an RTC out through PSP. • Michelle disapproved CR to release latches before umbilicals