This transcription has been completed. Contact us with corrections.
2 - Several should be installed to wall and ceiling areas as well as to the floor. -Use of the seat mounting holes could be used for foot restraints. -It was agreed that CB/S. Ride should be consulted on this entire subject. WASTE COMPARTMENT -The WCS locker was packed so tight that it bulged. The locker was too full - too loaded. Fiberglass bulged. [[16c will look @ this pers hyg boxes?]] -Yellow velcro was added on the port side of the WCS. Velcro should be permanently located where the yellow is. [[in work]] SHUTTLE PERSONAL OPERATIONS COMPUTER (SPOC). Deployed by L10 panel. Used very much; left up until deorbit burn; got hot but worked fine. WINDOW WASH KIT Very good item. Used a lot.[[stow 2 for dual shift ops (in camera bag)]] MULTI-USE MOUNTING BRACKETS The "Bagens" were OK, but the bracket-to-camera and the bracket-to-Orbiter interfaces were not tight. This caused problems. Brackets-to-quick shoe mounts were not tight. The crew requested that a means for tighter set ups be provided.[[Photo group aware + working on it (new prototype?)] FOOD SYSTEM AND RELATED -The crew provided a 35mm photo which showed the clutter. -Both of the food warmers were used. The "Y" cable worked. There was never an overload trip. -However, the crew really needed another hot water system. It was very inconvenient using cold water for washing. (test port 4)? [[Investigate to see about hook [guess]]]
Transcription Notes:
Could not decipher hand written notes. Needs addition of those transcriptions. Transcribed most of the hand written notes...left question marks of unknown words.