Viewing page 53 of 250

This transcription has been completed. Contact us with corrections.

11

2/13

Mike Drews (x4326) - RPAT test plan writer. 

(1) will call back in ~1 1/2 weeks to get on HP 9835 (tell Keith)

(2) is making a scale model, calibrated RMS (this will be a good deal)

RPAT: they are planning to use a Rockwell engineer to perform the RMS testing. Norm will be the CDR, not RMS pilot. [We need to do something about this]

THC/RHC in simulators (Cliff Mire / bldg. 5). Took SMS gripes over to bldg. 15 to where HC's are made. Mike Richardson (ED83 x4161) is contact. They've been working with 3/78 drawings from Nussman. Are these out of date? We squaked finger ring
spacing, "grittiness" of THC, questioned rate hold button & capture/release switch:

1) Teflon lubricant helped THC "stiction"

2) they'll change mounting plates, so units can be easily removed

✓- We will look into drawings, breakout forces, etc. on THC, & drawings/specs on RHC