Viewing page 66 of 250

This transcription has been completed. Contact us with corrections.

4. There is no capture constraint on ELP (on static grapple, ELP > -40[[degrees]]... not required for capturing free-flyer) [no study performed,or planned]
5. There was a rumor that anything from 0-32k constituted an "unloaded arm" for PRCS lining (?) ... not [[underlined]] true. We're to hold to 32k constraint for every payload > 0k. => milt shouldn't sign 409 (?) (some statements are incorrect (e.g. #3), in any case, not a useful document for MPAD).

FOD "Problems" tag-up
discussed above phone call of Karl; Promised (?) will call SPAR to confirm constraints
Mal/(1)(?)-Fa called Dick Lopez, he's checking into power switch
Mal/(2)(?)-there are no EPS malls (?) in RI FMEA (according to Fa)
Mal/(3)- uncommanded RMS motion can result from GPC, RCS, MPM, power, latch failures
mal (6) JPC bite (?): Fa called milt- he'll watch for ECR (filtercor (?) in BITE circuits can fail)
(mall (8))-first step: get drawing of PL bay including freon (?) lines, latches, etc. Rodney will track this down