GPC/SW exist; no D&C station (hand-controller, etc); MCIV modelled.

Performance testing - level 7 = overall test (not specific "put in a bit & check response")
GNC & orbiter system run together

V send: . FTO's
        . common validation runs
        . auto sequence

(333-7241) 64 IBM (SPD)

Staff meeting

V OMRSD review (11/12/13) = tell Nygren
. SPIDPO schedules JSC facilities for contractor use
. cracks in RMS light exist .....
. flight SPA's pulled due to short in connector pin (shoulder joint)
. EMC mtg. - CCTV included pass/fail? what are criteria

Talked to Clay about lighting sims. He'll call Franklin to talk about reflectance/blooming problem & sun angles (Wheelwright) - gave me Wheelwright's report on similar TRS studies