Viewing page 71 of 250

This transcription has been completed. Contact us with corrections.

Scene generation: 1 monitor, CCTV view (scene generator and visuals are same as for SES)

FOD in-house review of FTD's for ST3-2 and ST3-3 (KAIN, FITLERS, KUMAR, REEVES, FABIAN, RIDE). Approach: send memo to Stew Davis with copies to MP, NRCC, and SPAR. Have Stew schedule a telecon to resolve the problems we bring up.
[[strikethrough]]✓[[/strikethrough]] draft memo to Stew
[[strikethrough]]✓[[/strikethrough]] tell Scott Millican

2/27

DAP/RMS phases

(1) RCS inhibited - estimate drift (5 mins? 10 mins?). Is it compatible with pointing constraint (how severe?)
(2) "normal" RCS operations: VRCS active, pointing accuracy (deadband) determined by experiment requirements. PCRS ever required?
(3) DTD's: fire PRCS minimum impulse +/- yaw, roll, pitch. Is it known how many jets will fire (which ones, for how long, etc)?
(4) Prox ops: poise arm, then move in for final approach to capture. DAP mode, techniques
(5) stationkeeping with arm poised... translations, etc