18

-DAC telecon Friday (time TBD)
-telecon on light (Tuesday)

-wedges are out of spec
-PFTA for vertical installation at KSC
[[checkmark]] JR SAIL presentation to Thompson tomorrow

RPAT- (Brewster, TK, PJ) plan: (1) 1st week, have CDR from CB present at all times (2) always have CB RMS type there, operating the tests (or observing, if Norm is CDR)

3/3

FTD review with RI, MP, MPAD (STS-2). Gave inputs to Neil Stewart & Molowoki; memo to Steo expressing concerns (STS-2 only.... should do the same for STS-3)

MDF run: FUR 130 (1) standard length heel requires constant attention to pitch attitude in vicinity of guides (2) use forward & aft cameras near guides to get PL pitch (3) laser cuts at high ( how high do I haveto get before laser doesn't matter ?)