This transcription has been completed. Contact us with corrections.
18 -DAC telecon Friday (time TBD) -telecon on light (Tuesday) -wedges are out of spec -PFTA for vertical installation at KSC [[checkmark]] JR SAIL presentation to Thompson tomorrow RPAT- (Brewster, TK, PJ) plan: (1) 1st week, have CDR from CB present at all times (2) always have CB RMS type there, operating the tests (or observing, if Norm is CDR) 3/3 FTD review with RI, MP, MPAD (STS-2). Gave inputs to Neil Stewart & Molowoki; memo to Steo expressing concerns (STS-2 only.... should do the same for STS-3) MDF run: FUR 130 (1) standard length heel requires constant attention to pitch attitude in vicinity of guides (2) use forward & aft cameras near guides to get PL pitch (3) laser cuts at high ( how high do I haveto get before laser doesn't matter ?)