This transcription has been completed. Contact us with corrections.
22 3/28 ✓- call JWB (1) min rates used during 130 (2) FUR 131 (who's got test plan?) ✓- Rob: FUR 131 test plan? Problems 1. power switch - classified as crit 1, malf w.g. didn't press for fix. (FOD systems people + Peck will look at it + get back to us) 2. RI FMEA? RI: Functional criticality, not just HW crit. Close this issue after Q.P. looks it over 3. MG [[right arrow]] GPC failures? 4. fast jettison: (1) close (2) open new areas (a) Q.P. ✓ (b) A14 ✓ (I'll send around) (c) MPAD study ✓ Q.P. brief > Friday + Mike Mullane {deadface- only MRL's not @ shoulder {Step 1 always turn off RMS power [OSOP] 5. Crit 2 philosophy ? Bostick 6. JPC bite: close out ? Not hooked up, no bite (O.K.); filtercons?