Viewing page 109 of 250

This transcription has been completed. Contact us with corrections.

get as much out of experience & date (no benefit to procedures, techniques)
2) may not be able to perform loaded arm
test [[arrow pointing right]] may see something that makes youunwilling (or unable) to deploy it
[[arrow pointing right]] then you've lost your unloaded arm test.

IECM: at first, might say that the same arguments apply to IECM as to PFTA ....
do unloaded test first, then do ICEM ...
but, need go/no go) criterion .. and for IECM/REM that requires post-flight analysis: accuracy & controllability are critical for berthing task.
Run a real risk of leaving IECM in orbit

RI6? ... looks semi-reasonable

RMS jettison mtg
 
1) deadface  [[one large curly bracket two line height]] {operation 
                                                          {failure mode
2) jettison procedure
3) jettison dynamics ? (Safe configurations)
4) panel A14 

Transcription Notes:
*1. not sure how to key in #1) near the bottom which uses a large curly bracket - please review. *2. numbers 1, 2, 3, 4 at bottom, indicating lists, are circled - don't know how to key that.