This transcription has been completed. Contact us with corrections.
get as much out of experience & date (no benefit to procedures, techniques) 2) may not be able to perform loaded arm test [[arrow pointing right]] may see something that makes youunwilling (or unable) to deploy it [[arrow pointing right]] then you've lost your unloaded arm test. IECM: at first, might say that the same arguments apply to IECM as to PFTA .... do unloaded test first, then do ICEM ... but, need go/no go) criterion .. and for IECM/REM that requires post-flight analysis: accuracy & controllability are critical for berthing task. Run a real risk of leaving IECM in orbit RI6? ... looks semi-reasonable RMS jettison mtg 1) deadface [[one large curly bracket two line height]] {operation {failure mode 2) jettison procedure 3) jettison dynamics ? (Safe configurations) 4) panel A14
Transcription Notes:
*1. not sure how to key in #1) near the bottom which uses a large curly bracket - please review.
*2. numbers 1, 2, 3, 4 at bottom, indicating lists, are circled - don't know how to key that.