This transcription has been completed. Contact us with corrections.
Kain- drawing from Q.P.= V-guides are in the ŷ-plane (but they are in 2 pieces) [[boxed in]] 4/9 -TPS put 4 dry run (3rd shift) (1234)-RPAT -Sail GTS of STS: SW checkout on GTS. Main difference is hardware ✓-out: cable lengths, real data buses, real geometric layout are available on STS. Loren Wood TRW: Material Experiment Carrier (MEC) Deployed payload 333-3133 x253 4/15 at 10:00 ✓- talk to PJ ✓- talk to Bob Jones ✓- WBL: (1) RPAT (2)PJ ✓- Bill Nesbitt ✓- see Norm (his schedule/our level of support) ✓- Karl (1) RPAT (2) R17 (3) Murray ✓ ✓- schedule SMS brief to GWSA (4/18 1400) X- PLT for Toronto?