Viewing page 141 of 250

This transcription has been completed. Contact us with corrections.

JMF  EMC  procedure 5/29  1300  1/421

FAR  status  5/22  1300  1/720

JMF 5/29 & 5/30: ST3 users conference @ KSC

JR 1/738 5/23 1300 comments to draper FSSR

collision avoidance verification (MPAD & FOD) - with PDRSO
sign-off

structures people! They're going to SPAR & DFL to look
around

✓from MPAD: do we want their auto trajectory "crib sheet"?
They'd like them critiqued.... before &/or during RPAT testing

-comment to #223 (ABF testing): they should perform
the "constrained motion" test proposed for ST3-2.

Kaupp is looking at RCS RM.... problem of failed-on jets

OSS-1 w.g. @ KSC  RMS-to-PDP checkout cable = problems
were identified - who to talk to [S. Davi's?]

overlay (CCTV) schedule
functions & requirements  6/7/80
prototype hardware  12/15/80

Transcription Notes:
where I put ST3 it's either that or SB.