✓- Bill Jones: E & T to Toronto ~ last week of October (pitch plane, EM D+C panel, Simfac)
✓- Cecil: El arriving with JMF?
<--- window scenes down ... perform runs where they're not req. ->
9/25 10th Data run (II/18, unloaded, STS-2 track SIR-A)
short run, 2 separate sequences, use wrist CCTV to track bay
1st: [[image]] -> FWD   aft, pause, roll
2nd: [[image]]          aft, fly-by, sttd
Easy to monitor because of good visuals. Between sequences, have to do a manual rotation, taking roll from 0 -> 270, while pitch is at 270°... an Euler angle problem

9th Data run (II/11 , unloaded, STS-2 track SIR-A)
same as above data run (this was performed first). Malf 183C (broken shaft = joint fails free) was inserted at beginning of 2nd sequence (after initiation) ... sequence proceeded normally (appeared nominal, followed a good track) and terminated at proper point. Only after termination did encoder ✓ catch the malf. Implementation OK; response configuration & command dependent