This transcription has been completed. Contact us with corrections.
✓- Bill Jones: E & T to Toronto ~ last week of October (pitch plane, EM D+C panel, Simfac) ✓- Cecil: El arriving with JMF? <--- window scenes down ... perform runs where they're not req. -> 9/25 10th Data run (II/18, unloaded, STS-2 track SIR-A) short run, 2 separate sequences, use wrist CCTV to track bay 1st: [[image]] -> FWD aft, pause, roll 2nd: [[image]] aft, fly-by, sttd Easy to monitor because of good visuals. Between sequences, have to do a manual rotation, taking roll from 0 -> 270, while pitch is at 270°... an Euler angle problem 9th Data run (II/11 , unloaded, STS-2 track SIR-A) same as above data run (this was performed first). Malf 183C (broken shaft = joint fails free) was inserted at beginning of 2nd sequence (after initiation) ... sequence proceeded normally (appeared nominal, followed a good track) and terminated at proper point. Only after termination did encoder ✓ catch the malf. Implementation OK; response configuration & command dependent