CCBD G1521R1 has been approved by the GFE CCB and the Arriflex handgrip will be modified to include a second microswitch to allow operation of camera from handgrip without camera switch in standby position. 

TREADMILL NOISE 

Additional crew usage, crew testing, and  crew comments will be obtained after the next missions. 

FOOD TRAY - TO - LOCKER VELCRO 

MP/J. Blumentritt assigned action to correct the situation where two lockers are required for one food tray. More velcro will be applied to the lockers. The capability to mount one tray and tie up only one locker is required. 

VELCRO 

This subject will be worked off line as a CB input to the velcro maps. 

IFM (INFLIGHT MAINTENANCE) TASK IMPROVEMENTS 

MF/ J. Goodman assigned action to make analyses, and to implement warranted changes relative to Orbiter screws and fastners. 

A separate IFM meeting (with Messrs. Walker, Janes, Robbins, Townsend, and McAllister in attendance) will be held to review all IFM tools. One-of-a-kind items which are considered to be breakable may have quantity increased. 

SLEEP 

The 51-A crewmembers provided considerable data on sleep, sleep equipment, comfort, etc. Additional data will also be obtained from the next crews. 

FOOT LOOPS 

Action assigned to SP4/F. McAllister to propose straps which can be adjusted. 

LOCKER DOOR MEASUREMENTS 

Action assigned to SP4/F. McAllister to more clearly define the methodology involved. 

PORTABLE FOOT RESTRAINT 

Action is underway. A design change will be presented to the CCB December 10, 1984. This will review causes of, and prevention of, the universal being thermally locked into Y socket. 

AIRLOCK FOOT RESTRAINTS 

MF/ J. Goodman assigned action to analyze use of the restraints for subsequent EVA's. They were removed for EVA prep and to improve maneuverability. 

DEPRESS VALVE COVER REMOVAL