This transcription has been completed. Contact us with corrections.
CCBD G1521R1 has been approved by the GFE CCB and the Arriflex handgrip will be modified to include a second microswitch to allow operation of camera from handgrip without camera switch in standby position. TREADMILL NOISE Additional crew usage, crew testing, and crew comments will be obtained after the next missions. FOOD TRAY - TO - LOCKER VELCRO MP/J. Blumentritt assigned action to correct the situation where two lockers are required for one food tray. More velcro will be applied to the lockers. The capability to mount one tray and tie up only one locker is required. VELCRO This subject will be worked off line as a CB input to the velcro maps. IFM (INFLIGHT MAINTENANCE) TASK IMPROVEMENTS MF/ J. Goodman assigned action to make analyses, and to implement warranted changes relative to Orbiter screws and fastners. A separate IFM meeting (with Messrs. Walker, Janes, Robbins, Townsend, and McAllister in attendance) will be held to review all IFM tools. One-of-a-kind items which are considered to be breakable may have quantity increased. SLEEP The 51-A crewmembers provided considerable data on sleep, sleep equipment, comfort, etc. Additional data will also be obtained from the next crews. FOOT LOOPS Action assigned to SP4/F. McAllister to propose straps which can be adjusted. LOCKER DOOR MEASUREMENTS Action assigned to SP4/F. McAllister to more clearly define the methodology involved. PORTABLE FOOT RESTRAINT Action is underway. A design change will be presented to the CCB December 10, 1984. This will review causes of, and prevention of, the universal being thermally locked into Y socket. AIRLOCK FOOT RESTRAINTS MF/ J. Goodman assigned action to analyze use of the restraints for subsequent EVA's. They were removed for EVA prep and to improve maneuverability. DEPRESS VALVE COVER REMOVAL