Viewing page 8 of 11

This transcription has been completed. Contact us with corrections.

MF/J. Goodman assigned action.  Follow this item since it will be opened as an anomaly.

PSA (PROVISIONING STOWAGE ASSEMBLY)

MF/J. Goodman assigned action to evaluate impact of having space to stow the EV trash bags when there are items in the bags.

MFR OPERATION - ROTATION

ET/J. McCullough and MF2/N.  Townsend analyze MFR operation in which the handle to enable rotation took unreasonable force at end of rotation.

SLIDEWIRE CUSHIONS

EC/J. O'Kane and MF2/E.  O'Briant analyze crew comments on refastening snaps, on tiny cloth tabs, and on tether reel restowage.

35 FOOT TETHER REEL TENSION TOO HIGH

Redesign already in work on this item.

HYDRAZAINE DETECTION SYSTEM

SP4/J.  Day check analyzer to assure it was working during the mission.