DECISIONS AND ACTION ITEMS RELATIVE TO MISSION 41-G

CREW DEBRIEFING COMMENTS

EVA FLASHLIGHT: Epoxy has been put on the bulb to secure it in place on 51-A. This completes action on this item.

LOCKERS: SP4/F. McAllister assigned action to continue with locker design changes; i.e., (a) Obtain usable readings (deformation evaluation); (b) implement the hinge modification first: If that is not enough correction, proceed to implement the slide lock modification; (c) obtain ROM's for both the hinge and slide lock modifications.

HIGH DATA RATE RECORDER: DA6/R. Loe assigned action to check on this item. Include contact with MSFC. Evaluate acceptability of equipment and of crew sound suppression methods.

WET AND DRY TRASH: SP4/F McAllister assigned action to review and analyze all of the trash dispositioning. Evolve a plan on how KSC (or VAFB) will handle the trash as well as how they will return or dispose of it. A complete mission disposition plan is needed. The proper way to implement the plan should be included.

FOOT LOOPS IN MID-DECK: Additional crew experience is necessary before changes will be attempted.

SEAT RESTRAINT KITS: Debrief comments will be obtained from the Mission 51-A crew members. During normal recycling, straps should be lengthened.

VOLUMES G AND H DOORS: Action assigned to MF3/J. R. Goodman to assure implementation of "CHIT" to KSC. Inspection of the doors is required; follow up action may also be required after the inspection.

IMU AUDIO PANEL: Action assigned to DA6/R. Loe to assure compatibility between the IFM procedures and the Orbiter hardware.

GALLEY: Action assigned to SP4/F. McAllister to provide a "CHIT" to KSC to have the galley checked to determine the cause of the continuous running of the recirculating pump.

Action assigned to DA6/R. Loe and CB/S. Hawley to initiate a CCBD to delete the personal hygiene station. (The soap would be placed in the personal hygiene kit).

Action assigned to SP4/F. McAllister & MF/N. Townsend to assess possibility of making some corrections to the galley now in OV-099 and scheduled for usage in STS 51-C.

Action assigned to DA6/R. Loe to review the galley modification data and determine if additional velcro or changes to velcro is required. Follow up with CCBD if required.