[[bullet point]] cook memo internal budget [[bullet point]] "budget threat" (no safety) there were concerns... SRB [[5RB?]] "joint assembly" is crit 1, not 1R [[star]] come back to chronology Titan joint is different - 1 ring, joints' under compression MULLOY (MSFC) [[bullet point]] 7.5% compression required on O-rings [[bullet point]] shim inserted to [[up arrow]] compression on O-ring [[bullet point]] joint rotation: results in [[?]] unloading (result of ballooning) [[bullet point]] problem w/ ignitor [[?]] joint (fall '84 [[bullet point]] metal-metal around O-ring is usual-- not done here because of req'd lot [[?]] @ assembly