Viewing page 25 of 204

This transcription has been completed. Contact us with corrections.

[[bullet point]] (155-33) "primary concerns" - describe effect of ignition transient.
[[bullet point]] inspection after FRF's? loads analysis available?

30AUG85 (p138)
[[star]][[bullet point]] in "pgm plan": results of records search on QA, assembly, etc. metal quality still outlining a plan
HOW MUCH of this has been done? are results available? (p 138-140

20 NOV status: result of resiliency test?