![Transcription Center logo](/themes/custom/tc_theme/assets/image/logo.png)
This transcription has been completed. Contact us with corrections.
[[bullet point]] (155-33) "primary concerns" - describe effect of ignition transient. [[bullet point]] inspection after FRF's? loads analysis available? 30AUG85 (p138) [[star]][[bullet point]] in "pgm plan": results of records search on QA, assembly, etc. metal quality still outlining a plan HOW MUCH of this has been done? are results available? (p 138-140 20 NOV status: result of resiliency test?