Viewing page 29 of 204

This transcription has been completed. Contact us with corrections.

CRIP (phone/JSC) - "task force") realignment into 4 "elements": 

(1) engineering & analysis (ET SRB orb, launch facilities) 
(2) date/failure analysis (take info from 1st element) - George Hardy (*) 
(3) photo analysis (using enhancement) 
(4) salvage operations.

• SRB's probably can't be brought to surface

LEESTMA

• since putty change, for more blow-by (STS-8) Randolph putty isn't the best holds no loads, absorbs H2O (weaker) (not hydroscopic) One putty (GS43) holds 900 psi...why don't we use it? (Ablation)(Never been used in hot firing: can't be qualified for manned flight)

Transcription Notes:
parentheses in (1) is missing punctuation from original. Should read as follows: (1) engineering & analysis (ET, SRB, orb, launch facilities) Spelling error during transcription in first line of bullet-point under "LEESTMA": Should read: "far" more blow-by Also missing underlines in this section Missing comma after "absorbs H2O (weaker)"