CRIP (phone/JSC) - "task force") realignment into 4 "elements": (1) engineering & analysis (ET SRB orb, launch facilities) (2) date/failure analysis (take info from 1st element) - George Hardy (*) (3) photo analysis (using enhancement) (4) salvage operations. • SRB's probably can't be brought to surface LEESTMA • since putty change, for more blow-by (STS-8) Randolph putty isn't the best holds no loads, absorbs H2O (weaker) (not hydroscopic) One putty (GS43) holds 900 psi...why don't we use it? (Ablation)(Never been used in hot firing: can't be qualified for manned flight)
Transcription Notes:
parentheses in (1) is missing punctuation from original. Should read as follows:
(1) engineering & analysis (ET, SRB, orb, launch facilities)
Spelling error during transcription in first line of bullet-point under "LEESTMA":
Should read: "far" more blow-by
Also missing underlines in this section
Missing comma after "absorbs H2O (weaker)"