Viewing page 34 of 204

This transcription has been completed. Contact us with corrections.

PHOTOS
•black puff ~2s high, jet up the stack
•ET leak still possible. (.8" dim) ~4#/sec H2 lk from launch would be undetected
•smoke doesn't appear & come from test port
•wind tunnel tests planned @ MSFC & plot flow
•LH2 tank bottom is welded together circumferentially (automatic welds, each x-rayed, leak checked)
•launch facility not exonerated

Transcription Notes:
Error on first bullet point: should read "black puff ~25' high, jets up" error in second bullet point parenthesis; should read (.8" dia) Error in bullet point beginning with 'wind tunnel'; should read "tests planned @ MSFC to plot flow"