Viewing page 36 of 204

This transcription has been completed. Contact us with corrections.

• how much equipment is checked at contractor, and not re-inspected @KSC?

(O-ring lubricated @ Thiokol, diameter, checked @ Thiokol, bagged & sealed) 

A2: Horace Lamberth? 

MOSER

• Evidence that ET/SRB lower strut failed due to heating [[arrow]] SRB roll (rotation) in intertank, and contacted wing

A2: "out of roundness" of SRB segs: hydraulic apparatus was used and made seg round - used max 1200 psi+ on the 51L segment in question


Transcription Notes:
Reviewer thinks Thiohol is correct