![Transcription Center logo](/themes/custom/tc_theme/assets/image/logo.png)
This transcription has been completed. Contact us with corrections.
• how much equipment is checked at contractor, and not re-inspected @KSC? (O-ring lubricated @ Thiokol, diameter, checked @ Thiokol, bagged & sealed) A2: Horace Lamberth? MOSER • Evidence that ET/SRB lower strut failed due to heating [[arrow]] SRB roll (rotation) in intertank, and contacted wing A2: "out of roundness" of SRB segs: hydraulic apparatus was used and made seg round - used max 1200 psi+ on the 51L segment in question
Transcription Notes:
Reviewer thinks Thiohol is correct